Marin Mätteknik Dover Strait Routine Resurvey
- 2010-02-25
- By admin
- Posted in Hydrographic survey
Sub-contracted through NetSurvey to provide Marin Mätteknik AB with a Reports Coordinator for the MCA Dover Strait Routine Resurvey. Completing the 2009 Routine Resurvey workscope with MV Triad and MV Seabeam, this region is focused on Goodwin Sands and the Deep Water route through the Dover Strait.
Recent Posts
- BP Northern Endurance Partnership Route & Area Survey 20/04/2021
- BP Caspian Shallow Water Pipeline Inspection Survey 13/01/2020
- Equinor Nearshore Pipeline Inspection Survey Project 23/10/2019
- SSEN Pentland Firth HVAC Survey Project 14/09/2019
- Equinor Norpipe Nearshore Pipeline Inspection Survey Project 02/09/2019
Recent Comments
- admin on Marin Mätteknik Culver Sands to Flat Holm Survey
- martin sharp on Marin Mätteknik Culver Sands to Flat Holm Survey
- admin on Marin Mätteknik Culver Sands to Flat Holm Survey
- Arien Kampman on Marin Mätteknik Culver Sands to Flat Holm Survey
- Fred Colebrooke on Marin Mätteknik Lyme Bay – Natural England Survey
Archives
Categories
- Archaeology (3)
- Hydrographic survey (36)
- Other (13)
- Pipeline construction (11)
- Pipeline inspection (14)
- Renewables (8)
- Route survey (10)
- Topographic survey (1)
- UXO survey (6)