Nord Stream Pipeline Survey Project
- 2012-02-24
- By admin
- Posted in Pipeline inspection
Sub-contracted through NetSurvey to provide Nord Stream AG with a consultant, performing internal as-built survey data review and evaluation at their office in Zug, Switzerland. On 8 November 2011 the first of Nord Stream’s twin 1,224 kilometre gas pipelines through the Baltic Sea became operational. Construction work is expected to be completed on Line 2 in the third quarter of 2012.
Recent Posts
- BP Caspian Shallow Water Pipeline Inspection Survey 13/01/2020
- Equinor Nearshore Pipeline Inspection Survey Project 23/10/2019
- SSEN Pentland Firth HVAC Survey Project 14/09/2019
- Equinor Norpipe Nearshore Pipeline Inspection Survey Project 02/09/2019
- 4D Ocean Linne Crowlin and Loch Carron Survey 22/07/2019
Recent Comments
- admin on Marin Mätteknik Culver Sands to Flat Holm Survey
- martin sharp on Marin Mätteknik Culver Sands to Flat Holm Survey
- admin on Marin Mätteknik Culver Sands to Flat Holm Survey
- Arien Kampman on Marin Mätteknik Culver Sands to Flat Holm Survey
- Fred Colebrooke on Marin Mätteknik Lyme Bay – Natural England Survey
Archives
Categories
- Archaeology (3)
- Hydrographic survey (35)
- Other (12)
- Pipeline construction (11)
- Pipeline inspection (14)
- Renewables (8)
- Route survey (10)
- Topographic survey (1)
- UXO survey (6)