Contracted by Ocean Infinity AB to provide a Senior Data Processor for the TotalEnergies Culzean Site Survey project.
TotalEnergies are exploring the possibility of electrification of the offshore platform in the Culzean field, by installing a floating wind turbine. A geophysical / geotechnical and environmental survey of the proposed site was required to identify and map potential seabed hazards.
Hull-mounted MBES data was acquired by MV Deep Helder, whilst towing a dual frequency sidescan sonar and piggybacked magnetometer.