Best Painters in the New York City. We paint and decorate your homes.

Close Icon
   
Contact Info     Tel: +44 (0)7989 643141

Author Archives: admin

Post Image

Nord Stream 2 Route Development Survey Project

Contracted by MMT AB to provide specialist multibeam personnel onboard the MV Stril Explorer. Continuing the Nord Stream 2 Route Development Survey project in German and Danish waters, with high resolution data acquired along the proposed pipeline routes, enabling rapid target detection and route assessment.

Take a Tour 
Post Image

SMaRC Workshop

Contracted by MMT AB to provide specialist hydrographic survey personnel onboard the MV Franklin for the first Swedish Maritime Robotics Center (SMaRC) Workshop. SMaRC was created to promote innovative research in the area of maritime robotics, funded by the Swedish Foundation for Strategic Research as an Industrial Research Center. The research focus is on three target application areas; […]

Take a Tour 
Post Image

4D Ocean Hurst Point ASV Survey

Assisting @dmallace of 4D Ocean with an ASV survey at Hurst Point to combine with the UAV survey data acquired two weeks previously. As part of a Channel Coastal Observatory project, the results will be used to monitor erosion of the shingle spit. 4D Ocean’s ASV Harry is a SeaRobotics 2.5m unmanned surface vehicle used for conducting hydrographic surveys. With […]

Take a Tour 
Post Image

4D Ocean Hurst Point UAV Survey

Installation of geodetic ground control points at Hurst Point prior to a UAV survey by 4D Ocean for a Channel Coastal Observatory project. Hurst Spit is a hook-shaped shingle spit, extending 1.4 miles from the Hampshire shore into the Solent towards the Isle of Wight. The spit forms a barrier which shelters an area of […]

Take a Tour 
Post Image

Nord Stream Pipeline Inspection Survey Project

Contracted by MMT AB to provide a Data Processing Advisor onboard the MV Stril Explorer for the Nord Stream 2017 Pipeline External Inspection Survey project. This is a large-scale project with 2,400 kilometres of offshore pipelines to survey. The data acquisition commenced in April, and is expected to continue until September. A Supporter workclass ROV is fully […]

Take a Tour